Product categories

Made in China, Shengyang FRP

——

Tel: 0536-4971568

Fax: 0536-4832568

Q Q:541725060

Manager: Yin Huibin

Mobile: 13583651568

Address: No. 388, FRP Industrial Park, 2km south of Anqiu toll station, Weifang, Shandong, China



Back to previous page>>FRP Septic Tank
FRP Septic tank

Fixed Dimensions

Images with fixed dimensions
images/35x35/1.jpg

1.jpg


微信图片_20110208193629_副本222.jpg

initpintu_副本2.jpg

微信图片_20110208193618_副本22.jpg

微信图片_20110208193721_副本222222222.jpg

微信图片_20110208193713_副本22222222.jpg

微信图片_20110208193729_副本2222222222.jpg


Product introduction:

Glass reinforced septic tank

Scope of application:

Domestic sewage treatment in residential areas, office buildings, hotels, schools, hospitals, barracks, public toilets, municipal renovation of residential areas, and drainage treatment in food processing enterprises


Technical principle:

Compared with the traditional brick septic tank, the cylinder type integral septic tank made of high polymer material and high-strength fiberglass has the advantages of no leakage, easy transportation, high compressive strength, long service life of acid and alkali resistance, and quick installation. The cylindrical septic tank has a large volume of effective utilization, T-shaped stiffeners are arranged in and at both ends of the cylinder, and wheel type head is used outside at both ends, with concave convex design. This structure can improve the strength of the pool and the strength of the water pressure. The upper part of the tank body is provided with inlet and outlet water and clean-up holes. The membrane compartment in the tank is divided into three parts, i.e. primary sedimentation tank, secondary sedimentation tank and treatment tank. The compartment board is provided with a packing box filled with sewage treatment filler, which is a flexible vinylon tow.


The domestic sewage enters the primary sedimentation tank in the tank body from the upper water inlet of the septic tank, and the larger part sinks to the bottom of the tank for the treatment of manure. The smaller part floats on the upper layer of the water surface, which can be fished out from the clean-up hole. The upper sewage flows into the stuffing box through the sewage channel on the side of the stuffing box installed on the bulkhead, and contacts with the microorganism enriched by the suspended water treatment filler, so that there are Degradation of organic matter. Due to the principle of changing the direct flow flashing to the circulation flashing, the retention time of sewage in the tank increases, the contact degradation time of sewage and filler is longer, and the degradation degree of organics is higher, so that the BOD index in the discharged sewage is greatly reduced.

Equipment selection parameter table:


2.jpg

 

Product

FRP Container Series
FRP Pipe Series
Environmental Protection Equipment
FRP Cooling Tower Series
FRP Grid Series
FRP Sump Hood
FRP Septic Tank
FRP Anticorrosive Insulation
Wet Electrostatic Precipitator
FRP Chimney

Mobile QR code

Contact us

Made in China, Shengyang FRP

——

Tel: 0536-4971568

Fax: 0536-4832568

Q Q:541725060

Manager: Yin Huibin

Mobile: 13583651568

Address: No. 388, FRP Industrial Park, 2km south of Anqiu toll station, Weifang, Shandong, China